Goodbye to Trial and Error?


Reading time ( words)

All the time you spend at the production line for trial-and-error runs, just to get your production board right, takes away from your real production time. It comes on top of the time spent for trial and error at the screenprinter, and any other equipment in the line. All this can take an hour or more for each production board but, with all the tools now available, it can easily be significantly reduced. In addition, though, there are time-consuming actions (like loading all the feeders) to get right before the first error-free board comes out of the machine.

So, how do you minimize the whole trial-and-error process to ensure that, when a program starts up and feeders and toolbits are already on the system, the first board coming out of the machine is immediately good?

A perfect first board would mean that the correct components were all picked from the correct feeder and placed on the correct location at the correct placement angle. Guaranteeing this means ensuring that all the many pre-defined variables are correct: enough paste, exact board positioning, precise artwork, correct components picked by the correct toolbits and placed exactly. The more variables that are incorrect, the longer the ramp-up will take. The more programs each shift that require correcting, the shorter your effective production time and thus fewer boards produced. And during ramp-up, it’s better that the system stops to signal a fault than finding it out at the end during board test. It also helps save ramp-up time if all components are actually picked to get the program started immediately without false starts.

Read the full column here.


Editor's Note: This column originally appeared in the January 2014 issue of SMT Magazine.

Share


Suggested Items

5 Simple Elements to Guarantee Outsourcing Success

11/09/2017 | Neil Sharp, JJS Manufacturing
Rather than viewing outsourcing as a way to offload unwanted tasks, OEMs should spend time carefully selecting and then maintaining a properly managed relationship with their chosen EMS partner. Here are five simple elements that you should focus on before, during and after an outsourcing strategy to guarantee it is a success.

Surprising European EMS Market Numbers

10/27/2017 | Dieter G. Weiss, Weiss Engineering
If you think market analysis is always correct and predict the future exactly, you are mistaken. The latest annual reports from EMS companies with manufacturing sites in Europe have changed the picture on the European EMS industry quite a bit and caught us by surprise. Yes, you read that correctly: SURPRISE.

Should I Involve My EMS Partner in DFM?

10/26/2017 | Neil Sharp, JJS Manufacturing
OEMs are seeking the support of EMS providers with more than just manufacturing, but with design elements too. One of the main design services EMS providers will be likely to offer is design for manufacture (DFM). This article highlights why engaging your EMS partner in DFM is worthwhile, and will be valuable in securing the longevity of your product.



Copyright © 2017 I-Connect007. All rights reserved.